The Redevelopment and Restoration of the Tabernacle URC
The Tabernacle buildings have received the urgent repair that they needed securing the future of the building for future generations.
The Tabernacle United Reformed Church has undergone significant work on its buildings to complete a number of urgently required repairs to the fabric of the building. The process started in 2013 when architects were apointed and listed buildings consent was obtained for the most urgent repairs. Applications for funding were made to the Heritage Lottery fund, Cadw, the Welsh Synod and the Church both centrally and locally which allowed the most urgent repairs to be successfully carried out.
A second phase of regeneration of the building has begun which includes a new extension to the building and a modernisation of the entrance following a grant from the Communities Facility Programme and St John’s Church Tenby. This leads the Tabernacle URC along an exciting path to construct a multi-purpose facility whilst conserving the Victorian nature of the building.
Related Articles
Ecology and Wildlife
The Tabernacle’s burgage plot garden has long been unused and church members were keen to create a place of peace and solitude that could be enjoyed by themselves, local people and visitors.
Journey Through Time Garden
The Tabernacle United Reformed Church has a unique and dramatic plot that extends down to The Commons and features medieval stone walls, a cliff, a cave, a 17th century lime kiln and stunning views across The Commons to the South ...
History of the Tabernacle URC
This complete history of the Tabernacle URC was written by Jonathan E Harries in 2011. It gives the full story of the church from its origins in the year 1800 to the present day.
Archaeological History
The Tabernacle Church sits atop Pembroke’s limestone ridge and its burgage plot extends down to The Commons via a steeply sloping site which drops a total of 40 feet. Immediately to the south of the church is a tall ...
The Restoration of The Tabernacle URC
The Tabernacle buildings have received the urgent repair that they needed securing the future of the building for future generations.